Henan Jinshui Jinke construction and Development Co., Ltd. on the publicity of bid evaluation results of cable laying and jacking construction of Qingcui 110kV transmission line project in Zhengzhou City

Henan Jinshui Jinke construction and Development Co., Ltd. on the publicity of bid evaluation results of cable laying and jacking construction of Qingcui 110kV Transmission line project in Zhengzhou City

Henan Yuxin bidding is based on spectrum of American Association of electrical and electronic engineers Entrusted by Henan Jinshui Jinke construction and Development Co., Ltd., magazine 21 Co., Ltd. conducted a public bidding for the cable laying and pipe jacking construction of Qingcui 110 return journey in Zhengzhou City, which presses the piston back to kV transmission line project by its own weight. The bid opening and bid evaluation were carried out according to the specified procedures. Now the bidding and bid evaluation results of this bidding are published as follows:

I Bidding project name and number

bidding project name: cable duct laying and pipe jacking construction of Zhengzhou Qingcui 110kV transmission line project

bidding number: jsc2018-g-154

II. Brief description of the bidding project

construction location: within Zhengzhou Jinshui science and Education Park

bidding scope: this project starts from the end of 110kV Qingcui outgoing line cable tunnel, along the green belt on the north side of Yangjin road to the west side of Yingbin East Road, Along Longyuan 8th Street to the south to the new cable terminal tower, the 110kV pipe laying and pipe jacking path of the project is 1958 meters long, of which 110kV new 3 × The 4+1 MPP pipe row is 1558 meters, the newly-built reinforced concrete pipe passes through the 13 MPP cross road pipe jacking for 210 meters, and the 14 MPP pipe jacking for 190 meters

the scale of new pipe laying and pipe jacking is as follows: new 110 kV 13 position cable laying and pipe jacking (including 12 position 110 kV and 1 position communication), and the pipe laying scale is 3 × The cross-section layout of 4+1 row pipes is arranged according to the cross-section layout of reinforced concrete pipes passing through 13 MPP pipes

III. media and date

“ http://guoji.caigou2003.com/">," Henan provincial government procurement "," Zhengzhou municipal government procurement "," Jinshui District government procurement "," China Bidding public service platform " Published on

IV. bid evaluation information

bid evaluation date: September 20, 2018

bid evaluation place: bid evaluation room 2 of Henan Yuxin Tendering Co., Ltd.

bid evaluation experts: Luo Jing, Zhang Chuanwu, Liu Yejun, Hao Heping, Meng Sen

v Bid winning candidate information

bid section I:

first bid winning candidate: Henan Rongxin power installation Co., Ltd.

address of bid winning candidate: 5/F, science and technology building, No. 169, Songshan South Road, Erqi District, Zhengzhou City

bid quotation: 15 yuan

Project Manager: Min Xiaohua

bidding quality grade: qualified

construction period: 60 calendar days

candidate for the second bid: China tunnel tundun International Construction Engineering Co., Ltd.

bid winning candidate address: room 386, yongdingmennei East Street, Dongcheng District, Beijing

bid quotation: 72 yuan

Project Manager: Liu Sheng

bidding quality grade: qualified

construction period: 60 calendar days

candidate for the third bid: Hunan Longfei Power Construction Co., Ltd.

address of candidate for winning the bid: facade of Nongmin Street forestry station, quantang Town, Xiangxiang City, Hunan Province

bidding quotation: 86 yuan

Project Manager: Li FC 780 E and im style renkun

bidding quality grade: qualified

construction period: 60 calendar days

bid section II:

first bid winner candidate: China tunnel tundun International Construction Engineering Co., Ltd.

address of bid winner candidate: room 386, yongdingmennei East Street, Dongcheng District, Beijing

bid quotation: 75 yuan

Project Manager: Liu Sheng

bidding quality grade: qualified

construction period: 60 calendar days

second bid winner candidate: Henan Rongxin power installation Co., Ltd.

bid winner candidate address: 5/F, science and technology building, No. 169, Songshan South Road, Erqi District, Zhengzhou City

bid quotation: 89 yuan

Project Manager: Min Xiaohua

bidding quality grade: qualified

construction period: 60 calendar days

candidate for the third bid: Hunan Longfei Power Construction Co., Ltd.

address of bid winning candidate: front of Nongmin Street forestry station, quantang Town, Xiangxiang City, Hunan Province

bidding quotation: 15 yuan

Project Manager: Li renkun

bidding quality grade: qualified

construction period: 60 calendar days

VI. bid winning service fee

bidding agency service charge shall be implemented in accordance with the Interim Measures for the administration of bidding agency service charge (JJG [2002] No. 1980) issued by the former State Planning Commission. The expected service charge for bid winning of bid section I is 45200 yuan, and the expected service charge for bid winning of bid section II is 42100 yuan

VII. Contact matters of this bidding

tenderee: Henan Jinshui Jinke construction and Development Co., Ltd.

address: Yangjin Road, Jinshui science and Education Park, Zhengzhou City

contact person: Meng Sen

:

email: n@

bidding agency: Henan Yuxin bidding Co., Ltd.

address: 19/F, China building, No. 3, business outer ring road, Zhengdong New District, Zhengzhou City

contact person: Liu Xu, Guo Siyuan

.:

email: hnyx06@126.c This kind of method is relatively flexible om

if the parties concerned have objections to the results, they can raise questions in writing to the agency at the same time (stamped with official seal and signed by the legal representative) within 3 days from the date of the announcement of the results, and the legal representative or its original authorized representative will carry the copy of the enterprise business license (stamped with official seal), my identity card (original and stamped with official seal) The original of the challenge letter (stamped with the official seal and signed by the legal representative or its authorized representative) and relevant supporting materials shall be submitted together (the mailed and faxed copies will not be accepted), and the acceptance confirmation date of the challenge letter shall be taken as the acceptance time. The challenge letter that is not submitted within the time limit or not submitted as required will not be accepted